Skip to content
Workforce Housing

Worker Accommodation in Western Australia

Built for WA's harsh conditions.

From the Pilbara to the Wheatbelt — modular units engineered for FIFO, mining, agriculture, and construction.

Purpose-built

Built for the conditions, not in spite of them.

Each unit is built by KonBuild — a global leader in modular construction — and adapted to meet WA standards for safety, energy efficiency, and wind performance.

Typical applications

  • FIFO and mining workforce villages
  • Agricultural and seasonal worker housing
  • Construction site accommodation
  • Remote and regional project camps
Prefabricated modular worker unit with large glass double doors on construction site
Configurations

Single ensuite to double-storey camp.

Single rooms & ensuite units

Compact, private, air-conditioned rooms with beds, storage, and ensuite bathrooms — ideal for small teams or managers.

Shared dormitory units

Cost-effective layouts with bunks, shared bathrooms, and common areas for crew housing or short-term stays.

Kitchen, dining & laundry

Fully fitted communal facilities to keep your site comfortable and self-contained.

Stackable multi-unit

Double-storey configurations maximise space where site footprints are limited.
Why Modular

Fast to set up. Built to comply. Easy to relocate.

Speed

Factory pre-built and delivered ready to install — months become weeks.

Quality

Strict quality controls, corrosion-resistant steel, insulated panels.

Compliance

NCC 2022 + WA variations, Wind Regions B & D, optional BAL ratings.

Flexibility

Layouts to suit project size, workforce mix, and available site space.

Mobility

Quickly relocated or expanded as workforce or project needs change.
Worker accommodation unit with open entry door and roller shutter windows
WA Conditions

Built for WA's harsh conditions, from the cyclone-prone north to the cooler south.

Designed to perform across WA's diverse climates — from cyclone-prone regions in the north to cooler coastal areas in the south.

Wind-rated designs

Compliant with WA regulations for coastal and inland wind zones.

BAL options

Optional bushfire-resistant materials and design enhancements.

Insulated panels

Energy-efficient thermal control improves indoor comfort and reduces running costs.

Anti-corrosion

Heavy-duty coatings prevent damage from saline or dusty environments.
Approvals

Help with your DA, Building Permit, and council liaison.

Setting up worker accommodation typically requires a Development Application (DA) and Building Permit under local planning schemes. Our team assists with engineering documentation and site drawings, energy and wind compliance certificates, and council liaison and management plans.

We align with the WA Planning Commission's preference for accommodation near existing towns where possible — and work with you to streamline approvals at your specific site.

Customisation

Configure to your project, not a template.

  • Floor plans for 1–200 beds
  • Ensuite, shared, or dormitory options
  • Split-system air conditioning
  • Kitchen and dining modules
  • Site offices and meeting rooms
  • Solar and off-grid packages
Our process

From consultation to handover.

  1. 01 Step 1

    Consultation

    Tell us about your site, staff numbers, and timeline.

  2. 02 Step 2

    Design & quote

    We create a custom layout with transparent pricing.

  3. 03 Step 3

    Approvals

    Drawings, engineering, and council documentation handled.

  4. 04 Step 4

    Manufacture & delivery

    Units factory-built, shipped to WA, delivered to site.

  5. 05 Step 5

    Installation & handover

    Setup, connections, and final checks completed on site.

FAQ

Common questions.

Do your units meet WA building standards?

Yes. All worker accommodation is built to NCC 2022 standards with WA variations for wind, fire, and energy efficiency.

Can you deliver to remote regions?

Yes. We supply and install units across Western Australia, including remote and regional project sites.

How long does installation take?

Most accommodation setups can be installed within a few days of delivery, depending on site size and layout.

Do you assist with approvals?

Yes. We provide full documentation and can liaise with local councils for both development and building approvals.

Can units be relocated later?

Absolutely. Our modular systems are relocatable and expandable as your workforce or project grows.

Ready when you are

Workforce housing made easy.

Create a safe, comfortable, and fully compliant environment for your team — without the cost and delays of traditional construction.